Monday, September 14, 2015

Driveway project

Kyle got the driveway project mostly done. The new ditch is cut, the shed is moved, drive is all smooth and cable is burried. As far as I know the only thing left is wiring in the shed with a timer for wintertime plugging in trucks.

2 comments:

  1. Good job!!! Makes the place look bigger :0)

    ReplyDelete
  2. Very nice, that was a lot of work! You finished just in time for the snow :)

    ReplyDelete